Worcester, MA

2407 - Worcester Public Schools Handicap Accessibility Upgrades

Open Date INCORRECT DATE FORMAT
Filed Sub Bids
Close Date
10/10/2024 11:00 AM
General Bid
Close Date
10/24/2024 11:00 AM
Bid Description

Challenge & Reach Academy
1. The Work for the Challenge & Reach Academy shall consist of selective demolition; toilet
and stair renovation; and all repairs outlined in the Contract Documents.

B. Gerard Creamer Center
1. The Work for the Gerard Creamer Center shall consist of selective demolition, toilet and stair renovation; new doors and door frames; and all repairs outlined in the Contract Documents.

C. Lincoln Elementary School
1. The Work for the Lincoln Elementary School consist of selective demolition; steel framing;modification of existing roof; new ceilings and wall partitions; new elevator; new FP, plumbing, HVAC, and electrical; site work; and all repairs outlined in the Contract
Documents.

D. Thorndyke Road Elementary School
1. The Work for the Thorndyke Road Elementary School consist of selective demolition; steel
framing; modification of existing roof; new ceilings and wall partitions; new elevator; new
FP, plumbing, HVAC, and electrical; site work; and all repairs outlined in the Contract
Documents.

Filed Sub-Bids required are as follows:

(1)             Section 04 20 00 - Unit Masonry including 04 21 11

(2)             Section 05 50 00 – Metal Fabrications including 05 51 00, 05 52 13, and 05 55 

(3)             Section 07 25 00 – Weather Barriers including 07 27 26 and 07 92 00

(4)             Section 09 30 00 – Tiling

(5)             Section 09 51 13 – Acoustical Panel Ceilings

(6)             Section 09 65 16 – Resilient Flooring including 09 65 13

(7)             Section 09 91 13 – Painting

(8)             Section 14 24 00 – Hydraulic Elevator including 14 24 01

(9)             Section 21 00 00 – Fire Suppression

(10)          Section 22 00 00 – Plumbing

(11)          Section 23 00 00 - Heating, Ventilating and Air Conditioning

(12)          Section 26 00 00 – Electrical including 27 05 00, 27 41 00, and 28 10 00

PRE-BID CONFERENCE - The pre-bid conference will be held on 10:00 a.m., Thursday, September 26, at the project site, Lincoln Elementary School, 549 Lincoln Street, Worcester, MA 01605 beginning at 10:00 a.m. with a brief overview and tour of the construction areas. It is recommended that all Bidders attend this meeting.

G.C. Bid results attached

Bid Documents

You must Login or Register and become a Planholder in order to view bid documents.

Re: Worcester Public Schools Handicap Accessibility Upgrades
Date: 9/26/2024 5:43 am

Addenda #1

You must Login or Register and become a Planholder in order to view bid documents.

Re: Worcester Public Schools Handicap Accessibility Upgrades
Date: 10/3/2024 9:54 am

Addenda #2

You must Login or Register and become a Planholder in order to view bid documents.

Re: Worcester Public Schools Handicap Accessibility Upgrades
Date: 10/4/2024 5:55 am

Addenda #3

You must Login or Register and become a Planholder in order to view bid documents.

Re: Worcester Public Schools Handicap Accessibility Upgrades
Date: 10/11/2024 11:01 am

Addenda #4

You must Login or Register and become a Planholder in order to view bid documents.

Re: Worcester Public Schools Handicap Accessibility Upgrades
Date: 10/15/2024 10:34 am

Addendum #5

You must Login or Register and become a Planholder in order to view bid documents.

Re: Worcester Public Schools Handicap Accessibility Upgrades
Date: 10/17/2024 5:27 am

Addenda #6

You must Login or Register and become a Planholder in order to view bid documents.

© 2024 | Copyright City of Worcester, MA | All Rights Reserved.