Skip to content.

1611 - 2016 ARP Group 2: Chandler Community School and Gerald Creamer Center Window, Door, and Boiler Replacement and Associated Repairs

Open Date 03/15/2017
Filed Sub Bids
Close Date
04/05/2017 11:00 AM
General Bid
Close Date
04/20/2017 11:00 AM
Bid Description

The project scope generally includes:

 Window and exterior door replacement

Boiler replacement and associated controls

Construction of ADA compliant exterior ramps and railings and associated site work

Construction of new ADA compliant toilet rooms

Installation of vertical lifts to provide ADA compliant access between floors.

Filed Sub-Bid Categories:

 

  1. Section 04 00 01 MASONRY

  2. Section 07 00 01 WATERPROOFING, DAMPROOFING and CAULKING

  3. Section 08 00 01 METAL WINDOWS

  4. Section 08 80 00 GLAZING

  5. Section 09 30 00 TILING

  6. Section 09 00 07 PAINTING AND COATING

  7. Section 14 42 16 VERTICAL LIFT

  8. Section 22 00 01 PLUMBING

  9. Section 23 05 00 HEATING, VENTILATION, AND AIR CONDITIONING

  10. Section 26 05 00 ELECTRICAL

    PRE-BID CONFERENCE - The pre-bid conference will be held on Thursday, March 23, 2017 at 11:00 am beginning at the Gerald Creamer Center, 120 Granite Street, Worcester. We will then move to the Chandler Community School, 114 Chandler Street, Worcester at the completion of the Belmont School visit.  The pre-bid conference will provide a brief overview and tour of the construction areas. It is recommended that all Bidders attend this meeting.

Bid Documents

You must Login or Register and become a Planholder in order to view bid documents.

Re: 2016 ARP Group 2: Chandler Community School and Gerald Creamer Center Window, Door, and Boiler Replacement and Associated Repairs
Date: 3/24/2017 9:00 am

Addenda #1

You must Login or Register and become a Planholder in order to view bid documents.

Re: 2016 ARP Group 2: Chandler Community School and Gerald Creamer Center Window, Door, and Boiler Replacement and Associated Repairs
Date: 3/28/2017 11:54 am

Addenda #2 Group 2

You must Login or Register and become a Planholder in order to view bid documents.

Re: 2016 ARP Group 2: Chandler Community School and Gerald Creamer Center Window, Door, and Boiler Replacement and Associated Repairs
Date: 3/31/2017 9:51 am

Addenda #3

You must Login or Register and become a Planholder in order to view bid documents.

Re: 2016 ARP Group 2: Chandler Community School and Gerald Creamer Center Window, Door, and Boiler Replacement and Associated Repairs
Date: 4/7/2017 9:15 am

Addenda #4

You must Login or Register and become a Planholder in order to view bid documents.

Re: 2016 ARP Group 2: Chandler Community School and Gerald Creamer Center Window, Door, and Boiler Replacement and Associated Repairs
Date: 4/10/2017 12:01 pm

Addenda #5

You must Login or Register and become a Planholder in order to view bid documents.

E-Services
© 2024 | Copyright City of Worcester, MA | All Rights Reserved. | Disclaimer | Site Map