Skip to content.

2108 - DCU - Electric Vault Upgrade Renovations

Open Date 07/08/2021
Filed Sub Bids
Close Date
07/29/2021 11:00 AM
General Bid
Close Date
08/10/2021 11:00 AM
Bid Description

DCU - Electric Vault Upgrade Renovations

Filed sub-bid Catagories:

(1)                Section 042000 MASONRY

(2)                Section 099123 INTERIOR PAINTING

(3)                Section 230001 HVAC

(4)                Section 260001 ELECTRICAL

Please note:  Metal Fabrication, Waterproofing Damproofing & Caulking & Plumbing have been eliminated as Filed Sub-Bids.

DCAMM certification is: General Building Construction

 

PRE-BID CONFERENCE – Two (2) Scheduled Trade Specific pre-bid conferences will be held on Tuesday, July 13, 2021 for Item 1 & 2 Work; that will be limited to all areas except entry into the energized vault. The second pre-bid conference on July 14, 2021 for Item 1& 2 Work will include limited entry into the fully energized vault, at the project site, 50 Foster St., Worcester, 01608 beginning at 9:00 A.M. - 12 P.M. with a brief overview and tour of the construction areas. All contractors electing to enter the fully energized vault shall be required to have previously received the necessary training for entering into an energized environment. It is recommended that all Bidders attend these meetings. All bidders are required to provide their own extraction procedure, personnel and equipment for accessing the subterranean vault.

G.C. Bid results attached. 

Bid Documents

You must Login or Register and become a Planholder in order to view bid documents.

Re: DCU - Electric Vault Upgrade Renovations
Date: 7/12/2021 10:49 am

Addenda #1

You must Login or Register and become a Planholder in order to view bid documents.

Re: DCU - Electric Vault Upgrade Renovations
Date: 7/16/2021 3:59 pm

Addenda #2

You must Login or Register and become a Planholder in order to view bid documents.

Re: DCU - Electric Vault Upgrade Renovations
Date: 7/20/2021 10:06 am

Addendum #3

You must Login or Register and become a Planholder in order to view bid documents.

Re: DCU - Electric Vault Upgrade Renovations
Date: 7/30/2021 10:48 am

Addenda #4

You must Login or Register and become a Planholder in order to view bid documents.

Re: DCU - Electric Vault Upgrade Renovations
Date: 8/3/2021 11:36 am

DCU - Electric Vault Upgrade Renovations

Filed sub-bid Catagories:

(1)                Section 042000 MASONRY

(2)                Section 099123 INTERIOR PAINTING

(3)                Section 230001 HVAC

(4)                Section 260001 ELECTRICAL

Please note:  Metal Fabrication, Waterproofing Damproofing & Caulking & Plumbing have been eliminated as Filed Sub-Bids.

DCAMM certification is: General Building Construction

 

PRE-BID CONFERENCE – Two (2) Scheduled Trade Specific pre-bid conferences will be held on Tuesday, July 13, 2021 for Item 1 & 2 Work; that will be limited to all areas except entry into the energized vault. The second pre-bid conference on July 14, 2021 for Item 1& 2 Work will include limited entry into the fully energized vault, at the project site, 50 Foster St., Worcester, 01608 beginning at 9:00 A.M. - 12 P.M. with a brief overview and tour of the construction areas. All contractors electing to enter the fully energized vault shall be required to have previously received the necessary training for entering into an energized environment. It is recommended that all Bidders attend these meetings. All bidders are required to provide their own extraction procedure, personnel and equipment for accessing the subterranean vault.

G.C. Bid results attached. 

You must Login or Register and become a Planholder in order to view bid documents.

Re: DCU - Electric Vault Upgrade Renovations
Date: 8/6/2021 10:25 am

Addenda #6

You must Login or Register and become a Planholder in order to view bid documents.

E-Services
© 2024 | Copyright City of Worcester, MA | All Rights Reserved. | Disclaimer | Site Map